Search

Ruisheng Diao

from Richland, WA
Age ~42

Ruisheng Diao Phones & Addresses

  • 614 Sherwood St, Richland, WA 99352
  • 1115 Lemon St, Tempe, AZ 85281 (480) 966-2368

Resumes

Resumes

Ruisheng Diao Photo 1

Deputy Department Head And Staff Engineer, Pmu And System Analytics

View page
Location:
Pasco, WA
Industry:
Research
Work:
Pacific Northwest National Laboratory Jul 2009 - May 2018
Deputy Subsector Lead and Program Manager and Staff Engineer and Team Lead

Global Energy Interconnection Research Institute North America Jul 2009 - May 2018
Deputy Department Head and Staff Engineer, Pmu and System Analytics
Education:
Arizona State University 2006 - 2009
Doctorates, Doctor of Philosophy, Electrical Engineering
Zhejiang University 2004 - 2006
Master of Science, Masters
Zhejiang University 2001 - 2004
Zhejiang University 2000 - 2004
Bachelors, Bachelor of Science, Electrical Engineering
Skills:
Simulations
Matlab
Algorithms
Machine Learning
R&D
Sensors
Power Systems
Digsilent
Pslf
Pss/E
Trelss
Cart
C
Advanced Modeling
Power System Simulation
Online Security Assessment
Architecture Design For Advanced Power Grid Applications
Interests:
Photography
Music
Basketball
Languages:
Mandarin
English
Ruisheng Diao Photo 2

Ruisheng Diao

View page
Ruisheng Diao Photo 3

Power System Engineer At Pacific Northwest National Laboratory

View page
Position:
Power System Engineer at Pacific Northwest National Laboratory
Location:
Richland/Kennewick/Pasco, Washington Area
Industry:
Research
Work:
Pacific Northwest National Laboratory
Power System Engineer

Publications

Us Patents

Transformative Remedial Action Scheme Tool (Trast)

View page
US Patent:
20200387121, Dec 10, 2020
Filed:
Jun 7, 2019
Appl. No.:
16/435352
Inventors:
- Richland WA, US
Xinya Li - Richland WA, US
Emily L. Barrett - Richland WA, US
Qiuhua Huang - Richland WA, US
James G. O'Brien - Richland WA, US
Renke Huang - Richland WA, US
Zhangshuan Hou - Richland WA, US
Ruisheng Diao - Richland WA, US
International Classification:
G05B 13/04
G05B 13/02
Abstract:
Techniques and apparatuses are described that enable transformative Remedial Action Scheme (RAS) analyses and methodologies for a bulk electric power system, including methods of designing, reviewing, revising, testing, implementing, verifying, or validating a RAS. An improved RAS improves operation of the power system, including performance, reliability, control, and asset utilization. The example methodologies discussed—also referred to as a transformative Remedial Action Scheme tool (TRAST)—provide an end-to-end solution for adaptively setting RAS parameters based on realistic and near real-time operation conditions to improve power grid reliability and grid asset utilization, by leveraging utility data analysis and employing dynamic simulations and machine learning to significantly simplify and shorten the entire RAS process.

Time-Stacking Method For Dynamic Simulations

View page
US Patent:
20150149132, May 28, 2015
Filed:
Nov 21, 2014
Appl. No.:
14/550550
Inventors:
Zhenyu Huang - Richland WA, US
Ruisheng Diao - Richland WA, US
Di Wu - Richland WA, US
Shuangshuang Jin - Issaquah WA, US
Yu Zhang - Cordova TN, US
Yousu Chen - Issaquah WA, US
Bin Zheng - Richland WA, US
Assignee:
BATTELLE MEMORIAL INSTITUTE - Richland WA
International Classification:
G06F 17/50
G06F 17/13
US Classification:
703 2
Abstract:
A time-stacking method is disclosed. The time-stacking method simulates dynamics so as to obtain time-domain trajectories which correspond to a disturbance or event. The method includes providing a model for the system. The model includes differential equations and algebraic equations. The method also includes solving the differential equations and the algebraic equations over a predetermined number of time steps simultaneously using an implicit integration scheme.
Ruisheng Diao from Richland, WA, age ~42 Get Report