Search

Qingfeng Tao

from Katy, TX
Age ~47

Qingfeng Tao Phones & Addresses

  • 21714 Grand Hollow Ln, Katy, TX 77450
  • 2111 Holly Hall St, Houston, TX 77054 (713) 791-9095
  • 2300 Old Spanish Trl, Houston, TX 77054 (713) 791-9095
  • College Station, TX
  • Grand Forks, ND

Work

Company: Schlumberger Jul 2013 Position: Senior reservoir engineer

Education

Degree: Doctorates, Doctor of Philosophy School / High School: Texas A&M University 2006 to 2010 Specialities: Petroleum Engineering

Skills

Reservoir Modeling and Simulation • Coupled Reservoir Geomechanics Simulation • Pvt Analysis • Pressure Transient Analysis

Industries

Oil & Energy

Resumes

Resumes

Qingfeng Tao Photo 1

Senior Reservoir Engineer

View page
Location:
Houston, TX
Industry:
Oil & Energy
Work:
Schlumberger
Senior Reservoir Engineer

Schlumberger
Reservoir Engineer
Education:
Texas A&M University 2006 - 2010
Doctorates, Doctor of Philosophy, Petroleum Engineering
Skills:
Reservoir Modeling and Simulation
Coupled Reservoir Geomechanics Simulation
Pvt Analysis
Pressure Transient Analysis

Publications

Us Patents

Forecasting Oil Production For Multiply-Fractured Horizontal Wells

View page
US Patent:
20150331976, Nov 19, 2015
Filed:
Dec 18, 2014
Appl. No.:
14/575442
Inventors:
- Sugar Land TX, US
Qingfeng Tao - Katy TX, US
International Classification:
G06F 17/50
G06F 17/10
Abstract:
Methods, computing systems, and computer-readable media for forecasting oil recovery from a well. The method includes obtaining bottom-hole pressures, production rates, and a reservoir pressure for the well, and calculating pressure normalized rates based thereon. The method also includes forecasting a forecasted bottom-hole pressure for a first material balance time, based on the plurality of bottom-hole pressures, and forecasting a forecasted pressure normalized rate for the first material balance time based on the pressure normalized rates. The method further includes calculating a forecasted production rate for the first material balance time, based on the production rates, and determining a first forecasted cumulative production at the first material balance time based on the forecasted production rate, bottom-hole pressure, and pressure normalized rate, and converting the first material balance time to a first real time based at least partially on the forecasted cumulative production and production rate.
Qingfeng Tao from Katy, TX, age ~47 Get Report