Search

Priyatosh Barman Phones & Addresses

  • Renton, WA
  • 3S610 Warren Ave, Warrenville, IL 60555
  • Aurora, IL
  • 1005 Mandalay Ct, Naperville, IL 60563
  • 1625 Country Lakes Dr, Naperville, IL 60563
  • 1111 Laflin St, Chicago, IL 60607
  • Indianapolis, IN
  • Crest Hill, IL
  • Dekalb, IL
  • Peoria, IL

Work

Company: Paccar 2016 Position: Supplier quality leader and corporate lean six sigma master black belt

Education

Degree: Master of Business Administration, Masters School / High School: Depaul University - Charles H. Kellstadt Graduate School of Business 2002 to 2005 Specialities: Operations Management

Skills

Six Sigma • Cross Functional Team Leadership • Project Management • Lean Manufacturing • Process Improvement • Engineering • Leadership • Manufacturing • Supply Chain Management • Dmaic • Fmea • Quality Management • Supply Chain • Design of Experiments • Management • Data Analysis • Business Process Improvement • Failure Mode and Effects Analysis

Ranks

Certificate: Project Management Professional (Pmp)

Interests

New Leadership Position Opportunities

Industries

Logistics And Supply Chain

Resumes

Resumes

Priyatosh Barman Photo 1

Supplier Quality Leader And Corporate Lean Six Sigma Master Black Belt

View page
Location:
3s610 Warren Ave, Warrenville, IL 60555
Industry:
Logistics And Supply Chain
Work:
Paccar
Supplier Quality Leader and Corporate Lean Six Sigma Master Black Belt

University of Phoenix 2009 - 2016
Adjunct Faculty

Cvs Health 2015 - 2015
Business Process Improvement Consultant

Valspar 2012 - 2015
Global Master Black Belt

Advocate Health Care 2009 - 2012
Lean Master Black Belt and Operations Improvement Leader
Education:
Depaul University - Charles H. Kellstadt Graduate School of Business 2002 - 2005
Master of Business Administration, Masters, Operations Management
University of Cincinnati 1991 - 1994
Master of Science, Masters, Mechanical Engineering
Indian Institute of Science (Iisc) 1986 - 1988
Master of Science, Masters, Engineering
Delhi College of Engineering 1982 - 1986
Bachelors, Bachelor of Science, Mechanical Engineering
Indian Institute of Science
Skills:
Six Sigma
Cross Functional Team Leadership
Project Management
Lean Manufacturing
Process Improvement
Engineering
Leadership
Manufacturing
Supply Chain Management
Dmaic
Fmea
Quality Management
Supply Chain
Design of Experiments
Management
Data Analysis
Business Process Improvement
Failure Mode and Effects Analysis
Interests:
New Leadership Position Opportunities
Certifications:
Project Management Professional (Pmp)
Lean Six Sigma Master Black Belt
Six Sigma Black Belt
Cqe - Certified Quality Engineer
Exemplar Global-Certified Iso 9001:2015 Internal Auditor Training With Iatf 16949:2016 Automotive Emphasis

Publications

Us Patents

Method And System For Analyzing Cavitation

View page
US Patent:
20040112115, Jun 17, 2004
Filed:
Dec 17, 2002
Appl. No.:
10/320748
Inventors:
Chandra Ramamoorthy - Aurora IL, US
Arthur Milkowski - Sugar Grove IL, US
Gregory Moebs - East Peoria IL, US
Priyatosh Barman - Naperville IL, US
International Classification:
G01N003/62
US Classification:
073/001010
Abstract:
A method for analyzing cavitation in a component includes establishing an energy level associated with a system condition associated with the component and analyzing cavitation in response to said energy level

Automated Machine Component Design Tool

View page
US Patent:
20040138772, Jul 15, 2004
Filed:
Dec 24, 2003
Appl. No.:
10/743755
Inventors:
Priyatosh Barman - Naperville IL, US
Jose Lopez Dominguez - Bloomingdale IL, US
Assignee:
Caterpillar Inc.
International Classification:
G06F019/00
US Classification:
700/097000, 705/400000
Abstract:
A system and method for designing a machine component is provided. A plurality of requirements associated with the machine component are established. A component layout is automatically established in response to the plurality of requirements. The component layout is analyzed to determine whether the component layout meets a predetermined performance threshold. A final component design is established when the component layout meets the predetermined performance threshold. The system and method may further compare the component layout with a set of information related to existing machine components and identify an existing machine component that has a similar layout to the component layout. In addition, the system and method may determine the costs associated with the component layout and identify changes in the component layout to reduce the costs associated with the component layout. In addition, the method provides the opportunity to capture and implement design or analysis method improvements.
Priyatosh Barman from Renton, WA, age ~60 Get Report