Resumes
Resumes

Lead Engineer - Pinpoint Implementation Team At Halliburton - Special Services
View pagePosition:
Lead Engineer - Pinpoint Implementation Team at Halliburton - Special Services
Location:
Sherman/Denison, Texas Area
Industry:
Oil & Energy
Work:
Halliburton - Special Services - Duncan, Oklahoma since May 2013
Lead Engineer - Pinpoint Implementation Team
Halliburton - Houston, TX Jan 2004 - Apr 2013
Product Manager
Halliburton - Dallas/Fort Worth Area Sep 2001 - Jan 2004
Technical Advisor - Stimulation
Halliburton Technology Center - Duncan, OK Jun 1996 - Aug 2001
Scientific Advisor - Reservoir Conformance
Halliburton Energy Institute Oct 1993 - May 1996
Sr. Instructor - Well Stimulation
Lead Engineer - Pinpoint Implementation Team
Halliburton - Houston, TX Jan 2004 - Apr 2013
Product Manager
Halliburton - Dallas/Fort Worth Area Sep 2001 - Jan 2004
Technical Advisor - Stimulation
Halliburton Technology Center - Duncan, OK Jun 1996 - Aug 2001
Scientific Advisor - Reservoir Conformance
Halliburton Energy Institute Oct 1993 - May 1996
Sr. Instructor - Well Stimulation
Education:
Texas A&M University 1976 - 1980
BS, Agricultural Engineering
BS, Agricultural Engineering
Awards:
2010 Best Completion Technology - PowerReach
World Oil Magazine
PowerReach is a new concept in delivering live well intervention to extended reach horizontal completions. The process uses a combination string of jointed pipe on bottom and coiled tubing on top. This allows conventional coiled tubing equipment to run shorter strings of 2-3/8" or 2-7/8" coil while enabling continuous pipe movement during interventions in extended reach wells.
2011 Best Completion Technology - CobraMax DM
World Oil Magazine
CobraMax DM is a coiled tubing fracturing process that enables downhole mixing of proppant concentrate fluid pumped down the tubing with clean treatment fluid being pumped down the annulus of the casing. The process provides near instantaneous changes to proppant schedules downhole to allow for reservoir diversion of composite treatment fluid and creation of branch fractures.
World Oil Magazine
PowerReach is a new concept in delivering live well intervention to extended reach horizontal completions. The process uses a combination string of jointed pipe on bottom and coiled tubing on top. This allows conventional coiled tubing equipment to run shorter strings of 2-3/8" or 2-7/8" coil while enabling continuous pipe movement during interventions in extended reach wells.
2011 Best Completion Technology - CobraMax DM
World Oil Magazine
CobraMax DM is a coiled tubing fracturing process that enables downhole mixing of proppant concentrate fluid pumped down the tubing with clean treatment fluid being pumped down the annulus of the casing. The process provides near instantaneous changes to proppant schedules downhole to allow for reservoir diversion of composite treatment fluid and creation of branch fractures.